<acronym id="dqebo"><legend id="dqebo"></legend></acronym>
<output id="dqebo"><button id="dqebo"></button></output>

<var id="dqebo"></var><acronym id="dqebo"><form id="dqebo"></form></acronym>

<acronym id="dqebo"><wbr id="dqebo"><dd id="dqebo"></dd></wbr></acronym>

  • <listing id="dqebo"><object id="dqebo"><tr id="dqebo"></tr></object></listing><code id="dqebo"></code>

  • <output id="dqebo"><legend id="dqebo"></legend></output>
    • CCCC Water

      CCCC Water Transportation Consultants Co., Ltd.

      BIM Technology Application in the Municipal Infrastructure Phase I of Zhong-Guan-Cun Science and Technology Town

      Baodi District, Tianjin City, China

    Project Summary

    Project

    As part of a coordinated development plan, Zhong-Guan-Cun will integrate the resources of Beijing, Tianjin, and Zhong-Guan-Cun to build a science and technology city. The CNY 2.2 billion project includes the design and construction of roads, utility pipelines, a 174,000-square-meter park, and green roadsides spanning 477,000 square meters. As the overall project consultant, CCCC Water Transportation Consultants Co., Ltd. (CCCC) needed to develop an innovative city model.

    Solution

    The team used the integrated BIM capabilities of Bentley’s OpenRoads and OpenBridge Modeler with ContextCapture to generate a comprehensive 3D model of the entire city. The team collected terrain data via unmanned aerial vehicles to integrate into ContextCapture, generating the reality mesh. Given the large geographic span, wide construction area, and tight construction timeline, CCCC’s project team also implemented a collaborative BIM process. The team used Bentley’s Connected Data Environment to coordinate with the many engineering disciplines and seamlessly deliver the new digital city.

    Outcome

    The 3D model of the city helped CCCC identify and remedy more than 200 collision points, optimizing design and reducing costly rework. The model also allowed the project team to perform construction simulation, facilitating construction management. The simulation streamlined the construction process, shortening it by 64 days to save CNY 6.6 million in costs. Using ContextCapture to generate the reality mesh also facilitated earthworks planning and saved approximately CNY 40 million.

    Software

    ContextCapture was used to create the 3D model of the new science and technology city. LumenRT and Navigator helped further visualize the model and conduct analyses. OpenRoads helped complete the creation of the road engineering model while OpenBridge Modeler helped create the bridge and culvert engineering models. Bentley’s Connected Data Environment based on ProjectWise streamlined workflows and improved design efficiency.

    Project Playbook: ContextCapture, LumenRT, MicroStation, Navigator, OpenBridge Modeler, OpenRoads, ProjectWise, ProStructures

    Outcome/Facts
    • CCCC Water Transportation Consultants Co., Ltd. developed a reality model for the design and construction of a new science and technology city.
    • The team collected terrain data via unmanned aerial vehicles to integrate into ContextCapture, which was used to generate the reality model.
    • The use of Bentley technology to perform construction simulations helped shorten the construction process by 64 days to save CNY 6.6 million in costs.
    Quote:
    • “By using Bentley applications, we realized the benefits of an integrated BIM application in this project’s construction. Our team applied a brand-new workflow with highly efficient collaboration and integrated information sharing, resulting in all the project’s participants directly expressing our design ideas at the same time. This practiced enhanced the professional service capability, digital management, and construction quality on this project.”

      Zhiqiang Lu Deputy Chief Engineer CCCC Water Transportation Planning Design Institute Co., Ltd.
    彩53彩票网
    <acronym id="dqebo"><legend id="dqebo"></legend></acronym>
    <output id="dqebo"><button id="dqebo"></button></output>

    <var id="dqebo"></var><acronym id="dqebo"><form id="dqebo"></form></acronym>

    <acronym id="dqebo"><wbr id="dqebo"><dd id="dqebo"></dd></wbr></acronym>

  • <listing id="dqebo"><object id="dqebo"><tr id="dqebo"></tr></object></listing><code id="dqebo"></code>

  • <output id="dqebo"><legend id="dqebo"></legend></output>
    <acronym id="dqebo"><legend id="dqebo"></legend></acronym>
    <output id="dqebo"><button id="dqebo"></button></output>

    <var id="dqebo"></var><acronym id="dqebo"><form id="dqebo"></form></acronym>

    <acronym id="dqebo"><wbr id="dqebo"><dd id="dqebo"></dd></wbr></acronym>

  • <listing id="dqebo"><object id="dqebo"><tr id="dqebo"></tr></object></listing><code id="dqebo"></code>

  • <output id="dqebo"><legend id="dqebo"></legend></output>
    法甲女足球直播吧 浙江快乐12开奖走势图手机版今天 通化彩票中心 南昌棋牌游戏室内 快乐时时彩开奖查询结果 一肖中特免费公开资料香港马会 安徽十一选五开奖结果图库 黑龙江36选7开奖结果查询结果 娱乐场所防艾协议 2013年彩票销售额排名 一肖中特死公式 一尾中特免费公开资料 体彩湖北11选5走势 北京单场7串1命中6个 二肖两码中特