<acronym id="dqebo"><legend id="dqebo"></legend></acronym>
<output id="dqebo"><button id="dqebo"></button></output>

<var id="dqebo"></var><acronym id="dqebo"><form id="dqebo"></form></acronym>

<acronym id="dqebo"><wbr id="dqebo"><dd id="dqebo"></dd></wbr></acronym>

  • <listing id="dqebo"><object id="dqebo"><tr id="dqebo"></tr></object></listing><code id="dqebo"></code>

  • <output id="dqebo"><legend id="dqebo"></legend></output>
    • CCCC Water Transportation Consultants Co., Ltd.

      BIM Technology Application in the Municipal Infrastructure Phase I of Zhong-Guan-Cun Science and Technology Town

      Baodi District, Tianjin City, China

    Project Summary

    Project

    As part of a coordinated development plan, Zhong-Guan-Cun will integrate the resources of Beijing, Tianjin, and Zhong-Guan-Cun to build a science and technology city. The CNY 2.2 billion project includes the design and construction of roads, utility pipelines, a 174,000-square-meter park, and green roadsides spanning 477,000 square meters. As the overall project consultant, CCCC Water Transportation Consultants Co., Ltd. (CCCC) needed to develop an innovative city model.

    Solution

    The team used the integrated BIM capabilities of Bentley’s OpenRoads and OpenBridge Modeler with ContextCapture to generate a comprehensive 3D model of the entire city. The team collected terrain data via unmanned aerial vehicles to integrate into ContextCapture, generating the reality mesh. Given the large geographic span, wide construction area, and tight construction timeline, CCCC’s project team also implemented a collaborative BIM process. The team used Bentley’s Connected Data Environment to coordinate with the many engineering disciplines and seamlessly deliver the new digital city.

    Outcome

    The 3D model of the city helped CCCC identify and remedy more than 200 collision points, optimizing design and reducing costly rework. The model also allowed the project team to perform construction simulation, facilitating construction management. The simulation streamlined the construction process, shortening it by 64 days to save CNY 6.6 million in costs. Using ContextCapture to generate the reality mesh also facilitated earthworks planning and saved approximately CNY 40 million.

    Software

    ContextCapture was used to create the 3D model of the new science and technology city. LumenRT and Navigator helped further visualize the model and conduct analyses. OpenRoads helped complete the creation of the road engineering model while OpenBridge Modeler helped create the bridge and culvert engineering models. Bentley’s Connected Data Environment based on ProjectWise streamlined workflows and improved design efficiency.

    Project Playbook: ContextCapture, LumenRT, MicroStation, Navigator, OpenBridge Modeler, OpenRoads, ProjectWise, ProStructures

    Outcome/Facts
    • CCCC Water Transportation Consultants Co., Ltd. developed a reality model for the design and construction of a new science and technology city.
    • The team collected terrain data via unmanned aerial vehicles to integrate into ContextCapture, which was used to generate the reality model.
    • The use of Bentley technology to perform construction simulations helped shorten the construction process by 64 days to save CNY 6.6 million in costs.
    Quote:
    • “By using Bentley applications, we realized the benefits of an integrated BIM application in this project’s construction. Our team applied a brand-new workflow with highly efficient collaboration and integrated information sharing, resulting in all the project’s participants directly expressing our design ideas at the same time. This practiced enhanced the professional service capability, digital management, and construction quality on this project.”

      Zhiqiang Lu Deputy Chief Engineer CCCC Water Transportation Planning Design Institute Co., Ltd.
    彩53彩票网
    <acronym id="dqebo"><legend id="dqebo"></legend></acronym>
    <output id="dqebo"><button id="dqebo"></button></output>

    <var id="dqebo"></var><acronym id="dqebo"><form id="dqebo"></form></acronym>

    <acronym id="dqebo"><wbr id="dqebo"><dd id="dqebo"></dd></wbr></acronym>

  • <listing id="dqebo"><object id="dqebo"><tr id="dqebo"></tr></object></listing><code id="dqebo"></code>

  • <output id="dqebo"><legend id="dqebo"></legend></output>
    <acronym id="dqebo"><legend id="dqebo"></legend></acronym>
    <output id="dqebo"><button id="dqebo"></button></output>

    <var id="dqebo"></var><acronym id="dqebo"><form id="dqebo"></form></acronym>

    <acronym id="dqebo"><wbr id="dqebo"><dd id="dqebo"></dd></wbr></acronym>

  • <listing id="dqebo"><object id="dqebo"><tr id="dqebo"></tr></object></listing><code id="dqebo"></code>

  • <output id="dqebo"><legend id="dqebo"></legend></output>
    快乐赚app下载安装 彩票预测分析大师 山西快乐10分钟 山西福利彩票快乐10分 平码连肖复式表图片 香港六合彩现场开奖 福利彩票销售信息 青海快3助手 篮彩几种玩法 体育彩票走势图大乐透走势图 体彩顶呱刮中奖图片 东方6十1中奖规则 窗帘二连码是啥 羽毛球线 pc28最快参考