    • Hero_ProjectProfileGenericBG4

      HNTB Corporation

      M-1 Rail Streetcar Project – Advanced Utility Investigation

      Detroit, Michigan, United States

    Project Summary

    Project
    The USD 135 million M-1 Rail project will be an urban fixed-rail system connecting downtown Detroit, Michigan, to the New Center area along Woodward Avenue (M-1). The route is 3.3 miles long with 11 station stops. As part of M-1 Rail’s utility investigation, HNTB and its partner, Surveying Solutions Inc. conducted a detailed investigation of more than 700 manholes along Woodward Avenue using a state-of-the-art scanner and traditional survey methods.

    Solution
    The survey data verified the dimensions for tops of pipes and manhole widths and depths, and provided correct digital measurements of other features within each structure. This data was then incorporated into the project’s 3D model created from MicroStation, InRoads, and InRoads Storm & Sanitary. Bentley Navigator was used to perform clash detection and produce a list of anticipated utility impacts. Once the conflicts were refined by the utility owner, resolutions were discussed with each company to provide better outcomes.

    Outcome
    The utility investigation gathered information from public and private utilities, uncovered risks in the project area, established a clear picture of the final utility configuration, estimated the capital costs of relocations, and identified potential construction impacts related to utilities. The process provided increased project confidence and ultimately reduced costs for all parties. The USD 280,000 advanced utility investigation helped avoid more than USD 2 million in utility impacts.

    Software
    The dynamic scanner, which is able to scan a 50-foot-deep manhole in less than three minutes, took continuous photos of the insides of the manholes. The LiDAR survey produced a 3D point cloud of the interior of each manhole, which produced the horizontal and vertical depiction of the underground features within the Woodward Avenue corridor. The 3D model, built with Bentley technology, allowed the project owner to communicate visually with the utility owners about how to minimize utility impacts.
    Outcome/Facts:
    • Utilities in conflict with the proposed streetcar system included public utilities such as water, lighting, power, and transmission lines; and private utilities such as electrical lines, gas mains, steam lines, and telecommunication lines.
    • The horizontal and vertical track envelope was adjusted to accommodate relocated utilities and long-term maintenance access.
    • Close to USD 30 million was saved in design, construction, and interruption of services as a result of the utility investigation.
    彩53彩票网
    <acronym id="dqebo"><legend id="dqebo"></legend></acronym>
    <output id="dqebo"><button id="dqebo"></button></output>

    <var id="dqebo"></var><acronym id="dqebo"><form id="dqebo"></form></acronym>

    <acronym id="dqebo"><wbr id="dqebo"><dd id="dqebo"></dd></wbr></acronym>

  • <listing id="dqebo"><object id="dqebo"><tr id="dqebo"></tr></object></listing><code id="dqebo"></code>

  • <output id="dqebo"><legend id="dqebo"></legend></output>
    <acronym id="dqebo"><legend id="dqebo"></legend></acronym>
    <output id="dqebo"><button id="dqebo"></button></output>

    <var id="dqebo"></var><acronym id="dqebo"><form id="dqebo"></form></acronym>

    <acronym id="dqebo"><wbr id="dqebo"><dd id="dqebo"></dd></wbr></acronym>

  • <listing id="dqebo"><object id="dqebo"><tr id="dqebo"></tr></object></listing><code id="dqebo"></code>

  • <output id="dqebo"><legend id="dqebo"></legend></output>
    混合过关1串1 北京11选5走势图前三走势 山东11选5网易 黑金团队快乐8可靠吗 新疆11选5中奖助手 排球少年第三季评价 内蒙古时时彩平台 小霸王曾道人百家乐 本免费公开一码中特 体彩加奖规则 甘肃快三带线走势图 上海时时彩11选5 17099足彩半全场奖金 湖北快3今日推荐 幸运农场app